Construction Program
U.S. Route 1 Interchange
![]()
Construction Contracts:
Contract specific advertisement dates and bid results are available on VDOT's web page.

For a graphical summary of the contracts
for Maryland see Project
Overview or
Construction Program Overview / Schedule
Graphics.
| Contract Description | Est. Value $M |
Status of Advertisement |
Approximate Duration (months) |
|
| 1. | US Army Reserve Center Demolition. Project No. 0095-100-104,N506 |
Actual $110,075 |
Completed November 2000 |
|
| 2. | Ground Improvement Contract between US Route 1 and Telegraph Road Interchange. Project No.. 0095-96A-106, C503, D651 |
Actual $34.4M |
Completed April 2004 |
|
| 3. | Demolition of Hunting Tower and 2 garages. Project No. 0095-100-104,C510 |
Actual $988,000 |
Completed April 2004 |
|
| 4. | US Route 1 Tie-In Contract provides 6-lane tie-in to completed (OL) Woodrow Wilson Bridge. Includes reconstruction of Washington St bridge, urban deck and demolition of 3 Hunting Terrace buildings and 2 office buildings. Construct retaining walls and noise walls; relocate utilities; reconstruct Hunting Towers/Terrace Parking; provide memorial to Freedman's Cemetery. Construction of West Abutment of Woodrow Wilson Bridge. Project No. 0095-96A-106, B648-50, C504, C511, L802 |
Actual $54.4M |
Construction Underway |
72+ |
| 5. | US Route 1 Interchange Contract including Outer Loop low level / high level bridges mainline and ramp connections. Project No. 0095-96A-106,C520 |
Actual $38.3M |
Completed September 2005 |
24+ |
| 5A | Pile Indicator Program | Actual $664,250 |
Completed January 2003 |
|
| 6/7 | US Route 1 Interchange Contract including Inner and (OL) roadway mainline. Construct remaining bridges and interchange ramps, mainline roadway pavement, ground improvement, noise barriers, drainage systems, utility relocations, traffic systems, signs, roadway lighting and landscaping. Reconstruct and widen US Route 1 from Fort Hunt Road to Huntington Avenue. Project No. 0095-96A-106,C501 | Actual $146.6M | Construction Underway |
66+ |
| 8. | Jones Point Park improvements. Pending. Project No. TBD |
TBD | TBD | TBD |
| 9. | Virginia advanced ITS contract. Project No. 0095-96A-106 / 105, C-505 | Actual $1.53M * |
Completed April 2004 |
|
| * Combined with VB-1 for complete work through the U.S. Route 1 and Telegraph Rd Interchanges | ||||