September, 2007

<< Start < Prev 11 12 13 14 15 16 17 18 19 Next > End >>

Maryland Projects

<p><strong>I-295 Interchange</strong><br /> View looking west at the Maryland approach to the Wilson Bridge. The new pavement (two white pickup trucks) is the inner loop local lanes which accepted traffic in mid-September. This switch will enable the contractor to begin the inner loop express lanes. The earthwork in the background is the approach for the second bridge, scheduled to open in mid-2008 and fully open by the end of 2008.</p>
<hr />
<p><em>Photo Credit: PCC</em></p>
 
Description

I-295 Interchange
View looking west at the Maryland approach to the Wilson Bridge. The new pavement (two white pickup trucks) is the inner loop local lanes which accepted traffic in mid-September. This switch will enable the contractor to begin the inner loop express lanes. The earthwork in the background is the approach for the second bridge, scheduled to open in mid-2008 and fully open by the end of 2008.


Photo Credit: PCC