December, 2006

<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Bridge Projects

<div id="p7ssm_description" style="display: block;"><strong>Maryland Approach Spans</strong><br /> Aerial view looking northwest at the Wilson Bridge construction area. The first new bridge opened in mid-2006 and the construction of the second bridge will be completed in mid-2008. 
<hr />
Notice the small bridge structure at the bottom right of the picture, this is the bicycle/pedestrian path that will open in mid-2008 connecting Maryland to Virginia (path will be on the northern portion of the second span). 
<hr />
<em>Photo Credit: Trevor Wrayton, VDOT</em></div>
 
Description

Maryland Approach Spans
Aerial view looking northwest at the Wilson Bridge construction area. The first new bridge opened in mid-2006 and the construction of the second bridge will be completed in mid-2008.
Notice the small bridge structure at the bottom right of the picture, this is the bicycle/pedestrian path that will open in mid-2008 connecting Maryland to Virginia (path will be on the northern portion of the second span).
Photo Credit: Trevor Wrayton, VDOT