Maryland Approach Spans
View looking west at the new outer loop bridge. The bridge opened to two-way traffic in the summer 2006. The second span is under construction (just north of the first bridge). The two bridges are 15' apart in the river. A 2,000 foot section of the old bridge is being used as a work platform and will be demolished in the fall 2007.
Photo Credit: Trevor Wrayton, VDOT