December, 2006

<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Bridge Projects

<div id="p7ssm_description" style="display: block;"><strong>Bascule Span</strong><br /> View of the demolition of the old drawbridge pier section. This work is part of the Bascule (drawbridge) Span contract. The contractor is planning to detonate the structures in the January 2007 time-frame. 
<hr />
<em>Photo Credit: PCC</em></div>
 
Description

Bascule Span
View of the demolition of the old drawbridge pier section. This work is part of the Bascule (drawbridge) Span contract. The contractor is planning to detonate the structures in the January 2007 time-frame.
Photo Credit: PCC