Bascule Span
View looking north at the drawbridge section of the first of two bridges. This bridge was open in mid-2006 with the second scheduled to open in mid-2008. The cranes in the background are being used to construct the second bridge. Work continues on the inner loop drawbridge with the steel being delivered via barge from the manufacturer located in Florida.
Photo Credit: Trevor Wrayton, VDOT