U.S. Route 1 Interchange
View (looking north) from the connector roadway near the Hunting Point Tower Apartment Alexandria, Virginia of the sound wall panel installation. The sound wall panels are currently being installed and is expected to be completed in Spring 2005. On the other side of the wall is the future outer loop local portion of the Beltway roadway. This work is part of the U.S. Route 1 Interchange Tie-In Contract which is scheduled to be completed in the fall of 2007.
Photo Credit: PCC