May, 2005

<< Start < Prev 1 2 3 4 5 6 7 8 9 10 Next > End >>

Virginia Projects

<div id="p7ssm_description" style="display: block;"><strong>U.S. Route 1 Interchange</strong><br /> View looking west (from the Hunting Point Tower Apartment rooftop) of the South Washington Street deck over. The area below the deck, consists of the new outer loop Beltway (will be in the left tunnel and the express lanes are in the right tunnel ultimately). The recently paved road is the future outer loop local lanes. An interim operation will allow use of the two sets of lanes beginning in Summer 2005 so that work can proceed on the northern portion of the deck and on the existing Beltway. The concrete path coming up to the deck over will be the relocated Mt. Vernon bicycle/pedestrian trail. 
<hr />
<em>Photo Credit: PCC</em></div>
<!--[if IE 7]>
<style>
#p7ssm, #p7ssm div {zoom: 1;}
</style>
<![endif]--> <!--[if IE 6]>
<style>
#p7ssm a, #p7ssm, #p7ssm div, #p7ssm_thumb_wrapper {zoom: 1;}
.p7ssm_thumb_section {padding-right: 0; padding-left: 0;}
.p7ssm_thumb_section a {float: left;}
</style>
<![endif]--> <!--[if IE 5]>
<style>
#p7ssm {text-align: center;}
.p7ssm_sectionTrigger {text-align: left;}
#p7ssm_navList li {float: left; clear:both; width: 100%;}
#p7ssm, #p7ssm_w1, #p7ssm_w2, #p7ssm_description, #p7ssm_preview,
#p7ssm_navList a, .p7ssm_sectionTrigger a, #p7ssm_thumbs,
.p7ssm_thumb_section, #p7ssm_fsw {height: 1%;}
.p7ssm_thumb_section {padding: 0;}
</style>
<![endif]--> <!--[if IE 5.5000]>
<style>
#p7ssm, #p7ssm_w1, #p7ssm_w2 {zoom: 1;}
</style>
<![endif]-->
<p>
<script type="text/javascript">
&lt;!--
P7_SSMinit(3,1,1,1,0,1,1,1,15);
//--&gt;
  </script>
</p>
<div id="p7ssm_bottom"></div>
 
Description

U.S. Route 1 Interchange
View looking west (from the Hunting Point Tower Apartment rooftop) of the South Washington Street deck over. The area below the deck, consists of the new outer loop Beltway (will be in the left tunnel and the express lanes are in the right tunnel ultimately). The recently paved road is the future outer loop local lanes. An interim operation will allow use of the two sets of lanes beginning in Summer 2005 so that work can proceed on the northern portion of the deck and on the existing Beltway. The concrete path coming up to the deck over will be the relocated Mt. Vernon bicycle/pedestrian trail.
Photo Credit: PCC