June/July, 2005

<< Start < Prev 11 12 13 14 15 16 17 Next > End >>

Virginia Projects

<div id="p7ssm_description" style="display: block;"><strong>U.S. Route 1 Interchange</strong><br /> View newly paved roadway which will ultimately comprise of the outer loop (local and express lanes). This paved area will be used beginning in July/August 2005 on an interim basis for two way traffic until the Beltway inner loop roadway is completed. The red bridge buildings (on the left) are part of the Hunting Point Apartment complex. Alexandria VA. The traffic switch is part of the U.S. Route 1 Interchange Tie-in Contract which is scheduled to be completed in the fall of 2007. 
<hr />
<em>Photo Credit: Trevor Wrayton, VDOT</em></div>
 
Description

U.S. Route 1 Interchange
View newly paved roadway which will ultimately comprise of the outer loop (local and express lanes). This paved area will be used beginning in July/August 2005 on an interim basis for two way traffic until the Beltway inner loop roadway is completed. The red bridge buildings (on the left) are part of the Hunting Point Apartment complex. Alexandria VA. The traffic switch is part of the U.S. Route 1 Interchange Tie-in Contract which is scheduled to be completed in the fall of 2007.
Photo Credit: Trevor Wrayton, VDOT