Bridge Projects |
|
Mobilization of the Draw Span Contract.
Note: Completed pedestals will support the Draw span portion of the new twin bridges. There are two sets of three pedestals which support each side of the draw span. The rest of the supports need only two pedestals.
Photo Credit: PCC