Bridge Projects |
|
Virginia Approach Spans
View of the recently installed 24 inch pre-stressed concrete piles. These piles were approximately 40-50 feet in length. The contractor will begin the pier cap work (concrete and rebar base). The work area is located in Jones Point Park, Alexandria, VA.
Photo Credit: PCC