Maryland Projects |
|
MD 210 Interchange
View looking west at the construction of the new Capital Beltway outer loop local lanes. The green rebar (at the right) will be a physical concrete barrier separating local and express traffic. These lanes are expected to be open in the 2008 time-frame. This is part of the MD 210 interchange contract that began in 2005 and will be completed in mid-2008.
Photo Credit: PCC