<p><strong>Virginia Approach Spans</strong><br /> View looking east at one of the last pre-cast segment that was set as part of the Virginia Approach contract. The pre-cast pieces were manufactured on-site (two pre-cast beds, which are now dismantled). This area is near the Virginia abutment (where bridge meets land) in Jones Point Park, Alexandria, VA.</p>
<hr />
<p><em>Photo Credit: PCC</em></p>
 
Description

Virginia Approach Spans
View looking east at one of the last pre-cast segment that was set as part of the Virginia Approach contract. The pre-cast pieces were manufactured on-site (two pre-cast beds, which are now dismantled). This area is near the Virginia abutment (where bridge meets land) in Jones Point Park, Alexandria, VA.