Img-bkgd02
ImgBkgd03
ImgBkgd06
ImgBkgd05
ImgBkgd09
  ImgBkgd08
Jones Point Park
wwbLogo

Expand All | Collapse All

Project Overview
What and Why
Project Rationale
Project Area
Project Description
Overall Project Area
New Potomac River Bridge
Pedestrian / Bicycle Facility
Construction Summary
Funding
Project Ownership & Maintenance Agreement
Schedule
2007 / 2008 Overview Brochure
Powerpoint
Project Team
Description
Sponsoring Agencies
General Engineering Consultants
Keeping You Moving
Mission Possible
Commuter Solutions
Employer Solutions
Description
Telework
Flextime
Current Traffic Conditions
Description
Real Time Traffic
Lane Closures
Traveler Information
Regional Travel Solutions
Description
Maryland Statewide
Virginia Statewide
I-95 Corridor
Clearing Traffic Incidents
Bridge Openings
Mariner's Alerts
Construction Program
Overview
Support Services
Schedule Graphics
Potomac River Bridge
Project Description
Contractor Information
Construction Program with Status
U.S. Route 1 Interchange
Project Description
Contractor Information
Construction Program with Status
Telegraph Road Interchange
Project Description
Contractor Information
Construction Program with Status
I-295 Interchange
Project Description
Contractor Information
Construction Program with Status
MD Route 210 Interchange
Project Description
Contractor Information
Construction Program with Status
Environmental Mitigation
Contractor Information
Construction Program with Status
Current Contracts
Partnering Rating Forms
Project News & Your Views
Overview Meetings
Quick Summary
Progress
Finances
Public Worksessions
Newsletters
Fast Facts
Frequently Asked Questions
Press Releases
Special Initiatives
Bridge Demolition
Washington St Deck
Contact Us
General Information
Comment Form
Alexandria Office
Oxon Hill Office
Neighborhood News
Jones Point Park
Goals
Archeology
Landscape Changes
Current Update
Washington Street
General Information
Current Update
Telegraph Road
Current Update
Historic Cemeteries
General Information
Freedmen's Cemetery
St. Mary's Cemetery
Rosalie Island
General Information
Current Update
Community Impacts
Hunting Point on the Potomac
Weekly Schedule
Hunting Point Newsletter
Environmental Aspects
Mitigation
Site Map / Goals and Objectives
Environmental Jobs
Construction
Water Quality Monitoring
Air Quality Monitoring
Time of Year Restrictions
Turbidity Curtain
Dredge Disposal
Noise Barriers
Permit Compliance
Wildlife
Bald Eagles
Civil Rights / DBE Programs
Accomplishments
DBE Certification
CRB / CRC
Employment & Training
Project Scrapbook
What and Why
Past
Original Construction
Hunting Towers / Terrace
Alexandria, VA
Present
Archives
2007
2006
2005
2004
2003
2002
2001
2000
Illustrations
Before and After
Project Videos

 

Kid's Corner!

Neighborhood News
Jones Point Park


Landscape Changes at Jones Point Park

The plan that had been proposed by the Project, in conjunction with the Jones Point Park Stakeholder Participation Panel, the City of Alexandria and VDOT was approved through the City Council process.

An Environmental Assessment was prepared by the National Park Service (park owners), completed in 2001, and comments were received. A final document, incorporating the comments, was not completed.

The National Park Service desires to maintain access to the Potomac River. The concepts included in the Environmental Assessment are currently being reconsidered and new concepts have been developed by the Project. VDOT has forwarded three concepts to the National Park Service for consideration in an update to the Environmental Assessment. The City of Alexandria has been invited to submit concepts from their constituents, as well, and the communities are working on their concepts for the City submission.

The new parking and access need to be in place prior to opening the new Outer Loop Beltway in 2006. Otherwise, all access on Jones Point Drive will be closed as the contractors prepare to demolish the existing bridge and complete the new Inner Loop Bridge by 2008. In order for construction to take place, the Environmental Assessment needs to be completed, a Finding of No Significant Impact (FONSI) completed, including the chosen alternative for parking and access contract plans developed, approved, advertised, bid and a construction time allowed.

The landscape plans will be developed as a part of the parking and access but are not planned to be completed until the contractors have completed all bridge construction work, after 2008.


Once a narrow spit of land jutting into the Potomac, Jones Point has changed significantly in the last several hundred years. Originally, the lighthouse was built on a narrow peninsula that jutted out far into the Potomac, to ensure ships would see the light and stay clear of the shallows. Studies conducted during the archaeological investigations have tracked the changing dimensions of the point.

In 1910-1911 the Army Corps of Engineers dredged part of the Potomac, placing the dredge material in the water to the northeast of the peninsula, an area formerly known as Battery Cove, creating a land mass four times the size of the original Point, or 46 additional acres.

What is currently the park area was extended out into the river, alongside the peninsula on which the lighthouse stands, making the lighthouse part of the shoreline.