Img-bkgd02
ImgBkgd03
ImgBkgd06
ImgBkgd05
ImgBkgd09
  ImgBkgd08
Washington Street Deck
wwbLogo

Expand All | Collapse All

Project Overview
What and Why
Project Rationale
Project Area
Project Description
Overall Project Area
New Potomac River Bridge
Pedestrian / Bicycle Facility
Construction Summary
Funding
Project Ownership & Maintenance Agreement
Schedule
2007 / 2008 Overview Brochure
Powerpoint
Project Team
Description
Sponsoring Agencies
General Engineering Consultants
Keeping You Moving
Mission Possible
Commuter Solutions
Employer Solutions
Description
Telework
Flextime
Current Traffic Conditions
Description
Real Time Traffic
Lane Closures
Traveler Information
Regional Travel Solutions
Description
Maryland Statewide
Virginia Statewide
I-95 Corridor
Clearing Traffic Incidents
Bridge Openings
Mariner's Alerts
Construction Program
Overview
Support Services
Schedule Graphics
Potomac River Bridge
Project Description
Contractor Information
Construction Program with Status
U.S. Route 1 Interchange
Project Description
Contractor Information
Construction Program with Status
Telegraph Road Interchange
Project Description
Contractor Information
Construction Program with Status
I-295 Interchange
Project Description
Contractor Information
Construction Program with Status
MD Route 210 Interchange
Project Description
Contractor Information
Construction Program with Status
Environmental Mitigation
Contractor Information
Construction Program with Status
Current Contracts
Partnering Rating Forms
Project News & Your Views
Overview Meetings
Quick Summary
Progress
Finances
Public Worksessions
Newsletters
Fast Facts
Frequently Asked Questions
Press Releases
Special Initiatives
Bridge Demolition
Washington St Deck
Contact Us
General Information
Comment Form
Alexandria Office
Oxon Hill Office
Neighborhood News
Jones Point Park
Goals
Archeology
Landscape Changes
Current Update
Washington Street
General Information
Current Update
Telegraph Road
Current Update
Historic Cemeteries
General Information
Freedmen's Cemetery
St. Mary's Cemetery
Rosalie Island
General Information
Current Update
Community Impacts
Hunting Point on the Potomac
Weekly Schedule
Hunting Point Newsletter
Environmental Aspects
Mitigation
Site Map / Goals and Objectives
Environmental Jobs
Construction
Water Quality Monitoring
Air Quality Monitoring
Time of Year Restrictions
Turbidity Curtain
Dredge Disposal
Noise Barriers
Permit Compliance
Wildlife
Bald Eagles
Civil Rights / DBE Programs
Accomplishments
DBE Certification
CRB / CRC
Employment & Training
Project Scrapbook
What and Why
Past
Original Construction
Hunting Towers / Terrace
Alexandria, VA
Present
Archives
2007
2006
2005
2004
2003
2002
2001
2000
Illustrations
Before and After
Project Videos

 

Kid's Corner!

Neighborhood News
Washington Street Deck


Current Update

Latest sign posted for Washington Street Deck

There are several components of the contract for the reconstruction of Washington Street that are underway. Once the east side roadway, curb and gutter, ultimate Mt. Vernon trail were completed, work was shifted to the west side. A median is under construction between S. Alfred Street and South Street. The access from the temporary entrance at Hunting Point Apartments will be restricted to right turn only, while the median is under construction.

    Deck

The deck will be built in quadrants. The southeast quadrant has been completed until landscaping can be placed, later in the contract. The relocated Mt. Vernon trail is due to be opened in December 2006 from S. Washington Street to Jones Point Park, parallel to the Beltway and the new access roadway. The trail will go downgrade to join Jones Point Park, as the beltway rises to meet the bridge at the abutment.

    Lighting

The lighting in the parking lots at both the Hunting Point Terrace and Towers apartments is brighter than it was prior to the construction. Residents seem to like the brighter parking lots. There are actually fewer posts, although the lamps themselves emit higher-powered foot-candles. The ornamental lighting along S. Washington Street in the contract area has been in the process of installation over the last several weeks.

    Trail

The new Mt. Vernon trail will open in December 2006. At that time, the temporary trail around the perimeter of the Hunting Point on the Potomac towers property will be abandoned. The new trail will connect to Jones Point Park, ultimately to cross the bridge on the north side and to US Route 1.

The trail on the west side of Washington Street will parallel a ramp from US Route 1. This two-way shared pedestrian/bicycle path will end at northbound US Route 1 in the vicinity of the Hampton Inn. The foundations and supports for the sound wall have been placed and the sound wall panels will be placed in December 2006.

    Noise walls

The noise walls are similar in texture to the sample of “Old Town Brick” in the hunting terrace community. Both sides of the sound wall that wraps around the terrace community will be that brick.

The sound walls east of Washington Street will have a “fuzzy raked” finish, similar in color and texture to the sample on the Church Street ramp. The roadside will have a fluted finish similar to those walls near the Eisenhower Connector on the Beltway.

    Work Schedule

The contractor continues to work on Saturdays, as needed.